We do things differently at Col-Met Spray Booths, so it's perfectly understandable if you have certain questions for us. You can feel free to fire away anytime, but just to get the ball rolling, we've posted answers to some of the more common inquiries here.
Why does Col-Met provide nut and bolt construction for all of their spray booths?
Why sell through distribution?
What codes will my booth be required to meet?
What is included with my Col-Met Spray Booth?
Can I install the booth myself?
Why must I give you voltage when I order a control panel or an air make-up unit?
What standard booths do you generally keep in stock?
Why does Col-Met provide nut and bolt construction for all of their spray booths?
Nut and bolt construction provides consistent structural stability and makes for simple installation. Our booths can also be easily uninstalled and reinstalled as necessary.
back
Why sell through distribution?
Our distribution network allows us to provide local representation throughout North America, Canada, and Mexico. Our dealers are chosen to offer expertise and services on a local basis.
back
What codes will my booth be required to meet?
Most municipalities/cities require that paint booths, including installations, meet National Fire Protection Association (NFPA) Chapter 33, OSHA 1910, NEC, and more recently IFC. These are national and international code guidelines; however, local authority prevails in most cases and will have the final say on code requirements. Click here for NFPA Codes
back
What is included with my Col-Met Spray Booth?
The package will include all components needed to mechanically assemble the booth. The exhaust duct can be purchased separately as well as the control panel. The light tubes and the electrical wiring are not provided by Col-Met.
back
Can I install the booth myself?
Yes, depending on the style and complexity of the booth.
back
Why must I give you voltage when I order a control panel or an air make-up unit?
It is important to know the correct voltage because the motor protectors in the CP and the AMU unit must be sized according to the voltage.
back
What standard booths do you generally keep in stock?
The following booths are generally in stock or working:
| ECC-26-SB |
IB-04-07 |
EB-12 |
| ESD-26-SB |
IB-05-07 |
EB-15 |
| EMD-26-SB |
IB-06-07 |
|
| PMR -08-08-08 |
IB-08-07 |
|
| PMR -08-08-10 |
IB-08-08 |
|
| PMR -08-08-12 |
IB-12-07 |
|
| IBB-04-07 |
IB-12-08 |
|
*Note that availability status changes weekly, please
contact the factory to confirm availability.
back